Thread: 55 Wagon Progress
Hybrid View
-
01-12-2013 05:45 PM #1
Robert,
Amazing work as usual!!! In the first pic you had the pieces held together with sheet metal clamps but after trimming to remove the gap, how did you hold it together for the first tack welds? Also, what diameter is the wire you're using?
Thanks for sharing!!!
Randy"It is not much good thinking of a thing unless you think it out." - H.G. Wells
-
01-12-2013 05:54 PM #2
Thanks, The Eastwood clamps I use for fitment only, to get the joint close. Once the gaps were non-existent, I used c-clamp vise grips to hold the two panels together tightly, in about three different spots, and tacked them together. Typically you will have to planish some of the tacks before you get them all done, as the shrinking pulls the panels together too tightly where they try to overlap. A couple strikes on the last weld with the hammer and dolly usually spreads it back to flush again.Robert
I saw last night on fb about John. The world sure lost a great one. I'm going to miss his humor, advice, and perspective from another portion of the world. Rest in Peace Johnboy.
John Norton aka johnboy