Thread: 55 Wagon Progress
Results 1 to 15 of 1865
Threaded View
-
02-23-2019 09:41 PM #11
More progress on the fuel lines, with both lines now routed, we opted for glue lined heat shrink as an abrasion resistant covering where it passes closely to the body, and regular heat shrink to keep the two together.

Mike installs an anchor point for adel clamps in the shock crossmember




Test bends at the fuel pump..




Next to add some AN fittings..Robert





3390Likes
LinkBack URL
About LinkBacks
Reply With Quote
I'm happy to see it back up, sure hope it lasts.
Back online