Welcome to Club Hot Rod!  The premier site for everything to do with Hot Rod, Customs, Low Riders, Rat Rods, and more. 

  •  » Members from all over the US and the world!
  •  » Help from all over the world for your questions
  •  » Build logs for you and all members
  •  » Blogs
  •  » Image Gallery
  •  » Many thousands of members and hundreds of thousands of posts! 

YES! I want to register an account for free right now!  p.s.: For registered members this ad will NOT show

 
Like Tree13Likes

Thread: Project $ 3 K Is Underway
          
   
   

Results 1 to 15 of 3223

Threaded View

  1. #11
    Itoldyouso's Avatar
    Itoldyouso is offline CHR Member Visit my Photo Gallery
    Join Date
    Jan 2006
    Location
    fort myers
    Car Year, Make, Model: '27 ford/'39 dodge/ '23 t
    Posts
    11,033

    FRAME IS FINALLY ALL WELDED.


    It's about 12:30 AM, and Dan and I just put in a 12 hour day getting the frame for project $ 3K finished. Well, almost finished........there are still a zillion things to do, like build a front perch, hang the radius rods, etc. but at least the entire main frame is all welded, thanks to my Son, who gave up his only day off this week to spend it welding it for me. Thanks Dan. He says it is an early Fathers Day present, and I like it.

    First of all, we got all the final grinding done so that the weld joints would be beveled. He didn't like the way I did them last week, so he had me regrind the angles a little sharper to give him a better area to weld. Trouble with perfectionists like him is that they are usually right, so I couldn't argue.

    After that we clamped the side rails to his welding table and finished the kick up portions. When that was done, we clamped both rails to the frame jig and trued it all up, and triangulated it. For the rear I wanted to use a Model A rear crossmember, so we cut off the ends and slipped the remaining piece into the rear of the frame, and welded it all together. We are going to add some gussets and two tubular crossmembers right at the kickup, so we punched some holes in there to slip the tubes into.

    Now I can start channelling the body and getting it into its final position, and if I feel up to it tomorrow I will start on that. But right now I am totally wiped out from the heat and lifting steel tubing all day, so there is a hot shower and a cold screwdriver in my very immediate future. (the drink, not the tool )

    Here are some pix of what we did today.


    Don

    I
    Attached Images
    Last edited by Itoldyouso; 06-11-2006 at 07:36 AM.

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
Links monetized by VigLink