Thread: Project $ 3 K Is Underway
Threaded View
-
06-10-2006 09:45 PM #11
FRAME IS FINALLY ALL WELDED.
It's about 12:30 AM, and Dan and I just put in a 12 hour day getting the frame for project $ 3K finished. Well, almost finished........there are still a zillion things to do, like build a front perch, hang the radius rods, etc. but at least the entire main frame is all welded, thanks to my Son, who gave up his only day off this week to spend it welding it for me. Thanks Dan. He says it is an early Fathers Day present, and I like it.
First of all, we got all the final grinding done so that the weld joints would be beveled. He didn't like the way I did them last week, so he had me regrind the angles a little sharper to give him a better area to weld. Trouble with perfectionists like him is that they are usually right, so I couldn't argue.
After that we clamped the side rails to his welding table and finished the kick up portions. When that was done, we clamped both rails to the frame jig and trued it all up, and triangulated it. For the rear I wanted to use a Model A rear crossmember, so we cut off the ends and slipped the remaining piece into the rear of the frame, and welded it all together. We are going to add some gussets and two tubular crossmembers right at the kickup, so we punched some holes in there to slip the tubes into.
Now I can start channelling the body and getting it into its final position, and if I feel up to it tomorrow I will start on that. But right now I am totally wiped out from the heat and lifting steel tubing all day, so there is a hot shower and a cold screwdriver in my very immediate future. (the drink, not the tool)
Here are some pix of what we did today.
Don
ILast edited by Itoldyouso; 06-11-2006 at 07:36 AM.
John's ride to the cemetery, his beloved Billings OK bus, The Baby Elephant!! Traveling in style!! - -
John Norton aka johnboy