Thread: 55 Wagon Progress
				Results 1 to 15 of 1865
			
		Threaded View
- 
	04-18-2020 06:28 PM #11
 We're in the middle of blocking paint today on the core support and happened to notice someone forgot to add the holes in the new vertical uprights for the light wires to go across above the radiator.
 
 
 
 
 
 We have some rotary cutters that would do the trick but they are a bit short to reach from the outside (to keep things perpendicular) so lets make an extension. The set screw for the spring loaded center point is a 5/16-24 and we happened to have some in stock. So we used a piece of stainless fuel line and plug welded a stud in one end and a plug in the other for tightening in the drill chuck..
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 Holes drilled, deburred, and grommet test fitted..
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 Now for a test fit of our Parking brake lines to mock up the routing prior to adding rivet nuts and adel clamps...
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 And here's our one cable to two part layout..
 
 
 Robert 
 





 3390Likes
3390Likes LinkBack URL
 LinkBack URL About LinkBacks
 About LinkBacks 
 
					
					
 
				
				
				
					 Reply With Quote
 Reply With Quote
 
			
		
I'm happy to see it back up, sure hope it lasts.
Back online