Here are pics of the goose neck install. I'm also boxing the frame too.





I've got to notch my LH frame rail for the hitch release pin, and weld in a tube to reinforce it. Then I can weld in my lower supports, and finally weld in the center section. Right now the center section is being sand blasted. Here is a pic of my 4 link brackets I got in the other day. I'm still waiting for some gussets, and upper and lower bag mounts before I can get on that. Plus all my tubing and link parts aren't here yet.