Next I started to look at front suspension choices . I finally decided on a Heidts Superide front . This was not a bad install at all took about 2 days . May have taken less but I kept cutting the tape measure shorter just kidding smile some .

I welded in some cross bracing to keep the rails secure , and with a lot of help from the oldest son we got the front out and just test fit the Heidts subframe in .



Well with a lot of measuring from the directions and marking and double checking we was center the sub was tacked in . We kept measuring and after a bit decided it was fine and I welded it in