Finally got around to dragging my tig bottle to the front of the house so finally welded in the pedal/master cylinder strengthening plate I had made a few days ago.








Once welded in some black epoxy was brushed on.








Next job was to cut a 1/8" ply firewall panel (forgot to take a pic) this was then covered in black carpet, the various electrical gizmo's we then reattached. The gizmo's were placed to be practicle and easily reached for any adjustments.
Top left is the digital MSD ignition box, top right is the Rebel Wiring fuseblock, bottom left is the Aeromotive digital fuel pump controller, bottom right is the Snow water injection controller.

The black carpet reall tidys it all up.










While sorting out the various wires I got to thinking where was I gonna put my indicator switch, I didnt want it on the column and couldn't hide it under the seat like I usually do, decided to take it apart and see if I could squeeze it into my switch box between my seats.








Once the casing was removed I found there was just enough space for it, Its tight but it goes in ok.











Wiring next