Thread: Project $ 3 K Is Underway
Threaded View
-
04-07-2007 11:45 PM #11
Thanks Bobby. Dan just got home and he stopped at the shop on the way. He said the tunnel is all cured and it looks good to him. FINALLY !! Now I can set the body aside, finish up some minor bracket welding, and off to the sandblasters. I've been trying to get there for the past 3 months but couldn't do anything til this darned floor was done.
I think it will be a real boost to see the frame and running gear painted. Things should start to move pretty fast then. ( I hope)
Don
John's ride to the cemetery, his beloved Billings OK bus, The Baby Elephant!! Traveling in style!! - -
John Norton aka johnboy