Thread: 55 Wagon Progress
				Results 1 to 15 of 1865
			
		Threaded View
- 
	10-06-2019 07:11 PM #11
 Progress this weekend, We had originally left the factory jute insulation under the roof supports, thinking we could just butt up to it with the new stuff. After installing the Noico inside the doors, I guess my OCD wasn't about to leave the old stuff in the roof. So the bottom edge of the roof supports were scribed on the driver's side for relocation purposes, de-spot welded, and pulled downward enough to scrape off the old jute..
 
 
  
 
 
  
 
 
 https://www.youtube.com/watch?v=ZOj1...ature=youtu.be
 
 
  
 
 
 The bare area is then scuffed with 80 grit and two coats of SPI epoxy primer applied.. After that sets up we applied the Noico sound deadening mat to the inside of the roof skin. Then the roof supports are aligned with our scribed marks and plug welded in place..
 
 
  
 
 
  
 
 
  
 
 
 
 Mike has been plugging along on the Drummers Lounge sign, the arrow is close to done, it still needs fastening hardware added for the access panels, and holes added for the lights..
 
 
  
 
 
  
 
 
   Last edited by MP&C; 10-06-2019 at 07:49 PM. Robert 
 





 3390Likes
3390Likes LinkBack URL
 LinkBack URL About LinkBacks
 About LinkBacks 
 
					
					
 
				
				
				
					 Reply With Quote
 Reply With Quote
 
			
		
I'm happy to see it back up, sure hope it lasts.
Back online