Wow, Robert!! As I always say, "One thing always leads to a THOUSAND more!!!" but you handle each little "extra" with the mastery of artist! Watching your work is so educational and inspiring but it creates a lot more work for me because I have to raise the bar on my own projects. A little more bondo is no longer acceptable!! :LOL::LOL::LOL: Ok, my skill set is light-years behind yours so maybe I should just say I'll keep working at it till I use way less bondo than I did before! :D:D
-
Been following this project as many other have and I have to say that you are a craftsman. I know one or two other guys who can fabricate like you do and I do admire the work you do.
-
Thanks guys!
Had a couple hours to spend in the shop this evening, so I decided to mark out the roof for re-repairing.
http://i5.photobucket.com/albums/y16...Picture471.jpg
Then another line was dropped down about 1/4" to be used for the "rough cut". A cutoff wheel was used and then trimmed with the snips. The lower section was trimmed about 1/2" above the drip rail..
http://i5.photobucket.com/albums/y16...Picture472.jpg
To start, a section was marked off just wider than my sheet metal pliers. Then the spot welds, which were visible from the top, were drilled. A cutoff wheel was used to grind through the end(s) of the section being removed. Then the sheet metal pliers used to rock the panel back and forth to break the spot welds loose.
http://i5.photobucket.com/albums/y16...Picture473.jpg
http://i5.photobucket.com/albums/y16...Picture475.jpg
http://i5.photobucket.com/albums/y16...Picture477.jpg
Got about half of it removed, we'll save the rest for later so I can get some primer on the inside of some of the lift gate parts and the roof skin patch.
http://i5.photobucket.com/albums/y16...Picture478.jpg
http://i5.photobucket.com/albums/y16...Picture479.jpg
http://i5.photobucket.com/albums/y16...Picture480.jpg
http://i5.photobucket.com/albums/y16...Picture481.jpg
http://i5.photobucket.com/albums/y16...Picture482.jpg
-
Your work is outstanding, I like the details in your posts. Keep up the great work.
-
Thanks!
Continuing with the dissecting of the roof.....
http://i5.photobucket.com/albums/y16...Picture483.jpg
When I got into the section with the old roof, it was difficult to see the spot welds (for drilling) down inside the drip rail. The underside was more accommodating, so the face of the drip rail was marked with the sharpie to use as a reference while drilling...
http://i5.photobucket.com/albums/y16...Picture484.jpg
The lower corners of the opening were trimmed to size so that the roof patch could be clamped down into the drip rail. This will help to get more accurate markings on the roof skin for trimming the rest of the opening.
http://i5.photobucket.com/albums/y16...Picture489.jpg
http://i5.photobucket.com/albums/y16...Picture488.jpg
C-Clamp vise grips added to secure the overlapped panels for marking, then a straightedge used to read the crown of the roof to insure there were no dips or puckers along the top of the joint....
http://i5.photobucket.com/albums/y16...Picture490.jpg
My favorite scribe, a local auction purchase...
http://i5.photobucket.com/albums/y16...Picture491.jpg
Scribing the roof panel
http://i5.photobucket.com/albums/y16...Picture492.jpg
Not much to spare! Trimmed the opening with some offset snips...
http://i5.photobucket.com/albums/y16...Picture493.jpg
http://i5.photobucket.com/albums/y16...Picture494.jpg
Corners touched up with a 1-1/2" drum sander
http://i5.photobucket.com/albums/y16...Picture495.jpg
http://i5.photobucket.com/albums/y16...Picture498.jpg
Clamped in place to hold the shape while we wait for the .023 ER70S-7 to come in. Note the butt weld clamps will be removed at welding for a tight fit-up.
http://i5.photobucket.com/albums/y16...Picture496.jpg
http://i5.photobucket.com/albums/y16...Picture497.jpg
-
Like the 1" ? bar for holding form on roof. I have used 1x1x3/16 L iron. Really nice work. I hope this is your car Labor is going to be through the roof.
No pun intended
-
Very nice work sir! I highly doubt I would have been able to make that patch panel in the time you repair your rear hatch. :LOL: I need to get some of those butt weld clamps too.
-
I just use the butt clamps to assist in fit up, they get moved out of the way during welding for a tight butt joint.
Well today I had a phone call from 3 Mules to tell me the .023 welding wire was in. I had ordered .023 ER70S-7, but what actually showed up was EZ Grind. I guess I was destined to try this stuff out...
http://i5.photobucket.com/albums/y16...Picture613.jpg
After about 45 minutes of changing wire, rollers, and trying different settings on the machine, we found dialing it in for 3/16 thick steel and using 1/2 second weld "application" showed about the best results.. Seems odd as the metal was 19 ga, or about .038 thick..
http://i5.photobucket.com/albums/y16...Picture614.jpg
front:
http://i5.photobucket.com/albums/y16...Picture615.jpg
rear:
http://i5.photobucket.com/albums/y16...Picture616.jpg
Comparative size of the weld proud.
http://i5.photobucket.com/albums/y16...Picture617.jpg
http://i5.photobucket.com/albums/y16...Picture618.jpg
The special made tongs had returned from Houston, so we did the spot welds first to insure the panel was pulled down into the drip rail tightly..
http://i5.photobucket.com/albums/y16...Picture622.jpg
http://i5.photobucket.com/albums/y16...Picture619.jpg
http://i5.photobucket.com/albums/y16...Picture621.jpg
http://i5.photobucket.com/albums/y16...Picture623.jpg
http://i5.photobucket.com/albums/y16...Picture625.jpg
http://i5.photobucket.com/albums/y16...Picture626.jpg
Then the panels were aligned and tacked, starting at the rear and working toward the front...
http://i5.photobucket.com/albums/y16...Picture627.jpg
http://i5.photobucket.com/albums/y16...Picture628.jpg
http://i5.photobucket.com/albums/y16...Picture629.jpg
Full penetration welds....
http://i5.photobucket.com/albums/y16...Picture630.jpg
The patch should be well high enough for planishing this time...
http://i5.photobucket.com/albums/y16...Picture631.jpg
Here's where we left off.....
http://i5.photobucket.com/albums/y16...Picture632.jpg
http://i5.photobucket.com/albums/y16...Picture633.jpg
-
Wow! what a piece of work.. the alignment over the length is enviable.. great job there!
I've seen that wire but have been hesitant to try it as it isn't my normal type of job, how'd you like it so far?
-
The ER70S-7 I used was .035, and the EZ grind was .023. I find that .023 wire is more prone to tensioner and birdcage issues, which is another factor that dictated the heat setting. In planishing, the EZ grind appeared to be slightly harder than my experience with planishing the -7 on the fender shave. The EZ Grind also appears to have more slag issue than the -7. If I had my choice, it would be the -7, but the EZ Grind is still going to likely be better than using the -6 and it's harder welds.
-
Thanks for that info.. I'll be curious of your opinion after the work is completed. (I'm assuming the pictures are "real time", of course..) 8-)
-
Yes, those pics are as of last night.
-
Nice work, and thanks for the excellent explanations as you go and the great photos!
-
Awesome work. That spot welder is awesome. Do you do a few spot welds, walk away, let it cool, then come back and repete while doing the spot welds? I always did that and was told there was no need. Back when I was in college I worked in a body shop, and the owner had a pretty sweet spot welder. Some punks stole it about 10yrs ago though......
-
This one is a Miller 220v with the timer module. Needless to say when using it on the roof skin, you let it rest on top of your shoulder to be able to stand the weight that long. We aligned the ends and tacked them, then checked the contour just above the drip rail with a body sweep and would adjust the panel's lower flange in or out accordingly. We made a few tacks to hold those locations, splitting it in about quarters, then went back and filled in between. About the only "cool down" was when we set the welder down to check fitment with the body sweep.