Must be gettin old, this 1 took 66 days, althought was gone for 21 and didn't work on it.
Just got back from it 1st test drive, adjust carb and set timing better, then 400 more miles in the next week and off to Bowling Green KY for it's 1st trip
Printable View
Must be gettin old, this 1 took 66 days, althought was gone for 21 and didn't work on it.
Just got back from it 1st test drive, adjust carb and set timing better, then 400 more miles in the next week and off to Bowling Green KY for it's 1st trip
Absolutely stunning car Don, and one just has to look at any of your builds to understand how the correct wheel tyre combination can make or break the overall look of a car. We have a couple of '32's down here, one is a 3 window and the other a 5 window, which the owners have chosen wide 18 or 19" rims fitted with rubber band tyres on the front and maybe 20" wide rims with the same type of tyres on the rear and sadly, makes their cars look totally wrong but I emphasize the word " Their ".
Glad it all fell in place..........enjoy the wheels off of it! You have almost two weeks to dial it all in.............should be a fun trip...............
Top on and 250 miles, more miles, change oil, nut and bolt check and it's ready for BG Kentucky
Have a safe trip Don! The roadster looks great!
Enjoy the ride and think fond memories of your wife. Hope you have a great trip.
Excellent,
Can't believe how fast you have achieved this..
Looks Great.
Dave
You say that , but it took me 8 years to finish the Phantom. I suppose I did build 2 Pick Uos and look after a 46 Sedan at the same time.
If we get stuff send over by Sea it can take 6-8 weeks..
Still a great look car. Well done.