Hybrid View
-
02-17-2010 05:31 PM #1
got to work up to that rate---just counted and with those LTs to change to billet splayed 4 bolters got 32 blocks to do------can't do 5 a day at my age, but I can MULTI-task and run the boring bar same time as the surface grinder or CK10 hone--
-
02-17-2010 10:37 PM #2
yep me to.. i set the rottler up on a bore . deck a block . hone a set of rods out at the same time or valve work grinder /seat machine
when set up on a cut. the mill i run the feed very slow on the mill so it just crawls a long.the boring bar is a set it and for get it i never run it in hi speed i tried the carbide they stay will run good in hi speed its a so/so finsh so i run it in low it will peel or 025 to 055 of a cut just as nice with the one edge oe cutters
i use the replacement carbide cutter with holder on sleeve facing. i stay around the bar on the start of a cut and walk away from it. less i am cutting a sleeve out .i can only run 3 machines at the same time but not allways that busy. if i doing a valve job or rods. block honing . i try to set up a machine on a cut bore or deck a block
Irish Diplomacy ..the ability to tell someone to go to Hell ,,So that they will look forward to to the trip






LinkBack URL
About LinkBacks
Reply With Quote

I'm happy to see it back up, sure hope it lasts.
Back online