Welcome to Club Hot Rod!  The premier site for everything to do with Hot Rod, Customs, Low Riders, Rat Rods, and more. 

  •  » Members from all over the US and the world!
  •  » Help from all over the world for your questions
  •  » Build logs for you and all members
  •  » Blogs
  •  » Image Gallery
  •  » Many thousands of members and hundreds of thousands of posts! 

YES! I want to register an account for free right now!  p.s.: For registered members this ad will NOT show

 
Like Tree14Likes

Thread: Sticker shock when buying a battery
          
   
   

Reply To Thread
Results 1 to 15 of 19

Hybrid View

  1. #1
    vara4's Avatar
    vara4 is offline CHR Member Visit my Photo Gallery
    Join Date
    Dec 2003
    Location
    Pahrump
    Car Year, Make, Model: 1947 International Pick Up
    Posts
    3,188

    The last Smelting company will be shut down by the 31st, Ted.

    Herculaneum Smelter Update

    The Doe Run Company (Doe Run) has issued the following response related to the company’s Herculaneum, Mo., smelter:

    On Dec. 31, 2013, The Doe Run Company’s primary lead smelter in Herculaneum, Mo., which has operated since 1892, will cease operations. As a result of the smelter’s closure, 145 Doe Run employees, and approximately 73 contractors, will lose their jobs. Seventy-five positions will be retained for closure and limited operations. Although the United States is home to a number of secondary lead smelters, which recycle lead from various sources, the Herculaneum facility is the last primary lead smelter in the United States. (Primary smelters produce lead from mined resources.)

    In 2010, Doe Run reached a comprehensive settlement with the U.S. Environmental Protection Agency and the state of Missouri. As part of that settlement, the Company agreed to discontinue its smelting operations in Herculaneum by the end of 2013. Over the operating life of the smelter, the Company spent millions of dollars in environmental and other upgrades. Continuing to upgrade the aging smelter to attempt to meet the increasingly stringent environmental regulations imposed on primary lead smelters was not economically feasible given the many other requirements of our business.* We shared this news in 2010 in a press release available on our website.

    The Company had hoped to bring a revolutionary lead metal production technology online prior to the closure of the smelter. This proprietary, new technology (also announced in 2010) uses a wet-chemical, electrowinning process instead of a heat-based smelting process, greatly reducing sulfur dioxide and lead emissions. In 2012, we announced that the cost to build a comparably-sized electrowinning plant was too great for our company, given the present economic conditions and other demands on our operations. We continue to pursue opportunities to bring this technology to commercialization, perhaps on a smaller scale.

    This past year, we have worked with our Herculaneum employees to help them transition into new opportunities. Some have taken jobs within other divisions of our company; others have found new careers. Those who remain have been provided skill assessment and training, resume and interviewing skill building, financial counseling and a variety of services. We have a dedicated, hardworking and skilled workforce and we are making every effort to help them transition successfully. As noted above, we expect to keep approximately 75 employees at our Herculaneum facility in 2014 to assist with the continuing operations, including refining and alloying of lead metal, and closure of our site.

    More than 80 percent of all lead produced in the U.S. is used in either motive batteries to start vehicles, or in stationary batteries for backup power (particular in military, telecom and medical applications). In the U.S., the recycle rate of these batteries is approximately 98 percent, making lead-based batteries the most highly recycled consumer product. These batteries are recycled at secondary lead smelters. We own such a smelter in southern Missouri.

    Lead is used in numerous other products, including ammunition and construction materials, as well as to protect against radiation in medical and military applications. While most applications can use secondary lead, those applications that require primary lead will need to import the lead metal in the future. Any additional demand for lead (above that which can be met through recycling at secondary smelters) will also have to be met through imports.

    *In 2008, the National Ambient Air Quality Standard for lead was reduced from 1.5 µg/m3 (micrograms of lead per cubic meter of air) to 0.15 µg/m3.
    Last edited by vara4; 12-08-2013 at 10:01 AM.

Reply To Thread

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
Links monetized by VigLink