Lots to share : motor mounts welded mid summer, Aug picked up 700R4 trans from Gear Star 1 week lead time went to 3 after their booth @ NSRA Louisville was a hit, new Direct Sheet Metal firewall finally installed, new Direct Sheet Metal floor screwed togther (thanks to tech help from owner Dave) ready to weld, TCI trans mounts sized and ready to weld (I was way to fussy - still worried about limited trany mount clearing TFI frame mounted master brake. Next step is fab up exhaust make steering shaft clearence.
Hope I can get the pipe bender to add a flange to a the end of a pipe that is almost turned to a 90 degree bend?