Now time to reinstall the fuel filter along the frame out of the way, and drop the engine back in. Then reattach the transmission, and modify the transmission cross member to accommodate it being an inch forward. Cut a hole in the floor boards to mount the new Lokar shifter, rewire everything, and work on the dash a bit. That should keep me busy this winter! Not to mention reinforcing the frame in the rear with a new 4"x 1.5" beam 33" wide to tie the back of the bed and frame rails together.