I'm pretty much finished with the frame work. The front metal was removed, a Heidt's mustang II front end with tubular A-arms have been installed. The firewall moved back ~ 3 1/2 ". The original frame frame rails from the front core support to the firewall remain and have been tied into 2"x3" frame rails rearward. A shortened 9" with adjustable ladder-link has been installed which will turn the 29"x 12" Hoosiers (the largest tire allowable without altering the stock wheel opening). A flaming river tilt column replaces the stock steering box. And the build continues....