Results 1 to 15 of 121
Threaded View
-
08-16-2009 08:02 AM #8
Thanks Kurt. I was shooting for Oct 25th for the Billetproof Drags, but that is probably not going to happen. But I really would like it done for Turkey Run in Daytona Beach over Thanksgiving in November. I think I can make that one.
On a side note, I also think Dan's car might really, actually make it in November too!
We worked on cutting and rolling beads in his floor last night and we got one side all done when I left at 4 AM. He stayed until who knows what time, so I suspect he got a lot more done on the other side. Some guy is making his bomber seats right now and they should be done this week. The plan is to epoxy prime the subframe before we rivet in and seam seal the floor panels into place.
I didn't want to get right down to the wire on either car, but for some reason it always works out that way.
Don





LinkBack URL
About LinkBacks
Reply With Quote
It would be nice if this up and down crap would cease.
Back online