Threaded View
-
06-25-2008 07:39 AM #1
More Progress on the Thames ....
Things are really beginning to rock and roll now ..................
The floor and transmission tunnel have bee permanently welded in place
The firewall has had three beadrolls pressed and has been welded into place
The seats have been positioned and are sitting on their attachment brackets, the Hurst shifter has been positioned
The rear floor has been fabricated and is tacked into place
The wheel tubs have been completed and have been permanently welded into place
He's beginning to look a little like a car again
".......So sanded it all down and resprayed. ......" Been there. done that on a couple of paint jobs over the years. Usually took me a couple of days to get over being mad before I started...
Stude M5 build