A quick update:

The engine is in and the wiring harness is plugged in.
The exhaust is completed.
The brake lines and master cylinder are in.
The battery has been relocated. This required several re-engineerings but now the battery is under the trunk and yet still easily accessible. The battery is hung from the frame and the battery box covers it but does not support the weight of the battery.
The fuel supply and return lines are 95% complete. I am waiting to put the body back on before I make the final cuts on the fuel lines.
The gas tank is in, next I will plumb the fuel pump and cover the extra holes.
The undercarriage wiring harness is installed all the way back to the tail lights. I still need to wire the front end but I need to work on the radiator mounting and get the fenders back so I have something to secure the wiring to.

Once I seal up the gas tank and fuel pump I will be ready to get the body out of the back yard and back on the frame.

IMG_0412.JPG

IMG_0413.JPG