Not much to report, but I did dolly the nose some more. It's near perfect. Looking at lots of stuff. I picked up a nice quality 1/2" plywood for the roof. The plan is to make formers or ribs, which will force the roof into symmetry, and provide a framework for the missing section. Still planning to do carbon fiber replacement panel. But the body needs to be straightened first. I'm ra th her considering redoing the floor in steel.

But: the new schedule the plant went to which gave me three consecutive days off four times a month has been scrapped. It's six days a week now.

Ratz.