Thread: Ranger truck bed repairs
Hybrid View
- 
	06-14-2016 03:47 AM #1
 The new bed floor and cross member we had prepped ahead of time. We spent two days (Saturday and Sunday) from start to finish as shown, or roughly 40 man hoursRobert 
 
- 
	06-14-2016 02:22 PM #2
 





 16Likes
16Likes 
				
 
		
		 LinkBack URL
 LinkBack URL About LinkBacks
 About LinkBacks 
 
					
					
 Reply With Quote
 Reply With Quote Originally Posted by MP&C
 Originally Posted by MP&C
					

 
			
		
I'm happy to see it back up, sure hope it lasts.
Back online