Thread: 32 ford truck project
Hybrid View
-
11-22-2013 09:28 AM #1
Small update. We have been working a little bit on the radiator and about got it finished up.
Tanks, Filler neck, and hose inlet and outlets welded up.


Spun up some mounting bungs for the rod ends... The bolts have been replaced with the proper size stainless shoulder bolts now.

Test fitting


Getting the side trim made, pressure testing, and test fitting again




Made mounting tabs and got the condensor mounted and got the fan mounts made and welded.


got the frame mounts done and the thermostat welded up. The upper and lower hoses are fitted. Next will be mounting the grille and making an overflow tank then the cooling system will be done.






142Likes
LinkBack URL
About LinkBacks
Reply With Quote
Turn out the lights, the party's over THIS PLACE IS DEAD!
Dead!