Thread: Thames - 8/2/2010
Threaded View
-
08-02-2010 11:56 AM #1
Thames - 8/2/2010
.... All of the body off "plumbing" has been completed ......... short braided brake lines for the front have arrived ........ fuel system has been completed ........ fuel cell has been mounted and connected .......... vent tubes have been fabricated but won't be installed until final buildup ........... all chassis brake lines are complete ......... exhaust system has been completed ........... wheelie bars and springs have been adjusted for ride height .......... brake drums, starter & solenoid, seatbelts, copper header gaskets, fuse block, battery cables, toggle switches, spark plug wires have all been ordered ......... hope to have the body off by the middle of next week to begin total tear-down of chassis in preparation for paint ......... really starting to get "itchy" now .......... want to get him completed and on the streets
Last edited by Old Coyote; 08-02-2010 at 01:16 PM.
I had to go to the doctor's this morning. He told me that my sugar was too high so I came home and put it on a lower shelf. I feel better already.
the Official CHR joke page duel