Clean up bore, good machine work, aluminum heads 10.5-1 compression, balance, hydraulic roller with 272/282 duration (seat to seat) and .510/.520 lift should do it.

If you.re running an automatic trans plan on a 3500-2800 stall convertor/
.

Good luck