Finally had time and a good weather to put up the lift. Deviated a little from the written instructions just make things easier.

The lift came very well packed.



Layed the posts down and inserted the cross bar and lift them up instead of standing the posts up and dropping them in.



Tilted up the posts and cross bar and then set the deck platforms on the cross bars.





Lifted the whole thing up with the crane to run the cables and hydraulic lines.



Completed lift on the casters. Need to move the cars out of the shop to get it in. I will use this one for storage. I'll get a 2 post to work on the cars.



Lift is in the shop and in use for storage. Will be ordering a 2 post soon.