Thread: New build thread; 48 Plymouth
Results 1 to 15 of 1007
Threaded View
-
12-31-2010 09:03 AM #11
I know exactly what you're saying, Roger. We had a huge dispute with Trane last year over the cost of some VFDs and it was submitting our emails to the attorneys that got it straightened out. It can get pretty relentless some days but I do feel a little better after a week. Although my second day back I ended up being there 23 hours straight because of some major building heat problems.
My friend Kyle has been putting some time in on this and it's nice to have the help. He's been finishing up some metal repair and is getting ready to start at one corner of the car and work his way around smoothing everything. I've been painting some POR-15 in all the hidden cavities and the trunk floor to try and make sure the rust stays gone once we're done. It's moving along pretty good; as soon as we've got the main body finished and primered, I'll move to setting the drive train, and setting up the steering.





605Likes
LinkBack URL
About LinkBacks
Reply With Quote
It would be nice if this up and down crap would cease.
Back online