Results 1 to 15 of 20
Threaded View
-
05-31-2006 07:30 PM #11
i've cut and welded 15 to 20 shafts over the yrs. and never had the need to bal. one. i'd spend that 125.000 somewhere else. i'd make sure the shaft is straight first, then check the tires close.Mike
check my home page out!!!
http://hometown.aol.com/kanhandco2/index.html





LinkBack URL
About LinkBacks
Reply With Quote
Either return this forum to what was or get the HELL OUT!
Dead!