this is a long term project that i've been working on for over 10 yrs.it started out with a fibreglass body but i was lucky enough to find a steel one and replace it.i paid a hotrod builder to do the chassis using local fabricated 32 rails and pete and jake suspension parts and a currie 9" diff. all fairly standard hotrod stuff.