Thread: Project "Left Overs"
Threaded View
-
12-23-2010 10:16 AM #7
Don
about the tapered frame rail ---you might want to look at taking a piece of 3 tube and a piece of 4 inch--cut them both and swap halves so that you have a 3to 4 taper--less cutting but same amount of welding
you can cut a 2x piece of lumber for mockup/practicality





LinkBack URL
About LinkBacks
Reply With Quote
Down all day yesterday, up today, shit or get off the pot.
Where is everybody?