Thread: Time TIC TIC
Threaded View
-
11-16-2005 08:45 PM #5
One thing to consider is getting things ordered that require the most lead-time.
Some items that can often be a 4-6 weeks are Hoods, radiators, grille inserts, windshield frames, gas tanks, steel fenders, rear end housings, etc.
Get these things ordered now, and if you are on a budget, at least call the vendor you plan to use for these items and check on the availability and/or time frame for delivery on those items.
Good luck.





LinkBack URL
About LinkBacks
Reply With Quote
Down all day yesterday, up today, shit or get off the pot.
Where is everybody?